Electrolysis pipe parts manufacturers: 1 lower baseboard: that is, the toilet floor (or local floor) under the way 2 wall columns (to the installation system of the hidden disadvantages of the pipe as the main feature) Ningbo PE homogeneous siphon pipe parts manufacturers way 3 layer type. (1)Lowering board:Toilet sinking drainage way refer to <Residential toilet> 01SJ914.The specific practice is to put the toilet's structure building's lower level (local) 300mm as the pipe laying space.

Sinking building slab using the current sink to make a waterproof layer, in accordance with the design standard height and slope along the lower floor slab, laying drainage pipe, Taizhou PE co-layered siphon pipe fittings manufacturers and then filled with cement soya bean dregs and other lightweight materials as a backing liner, it was pointed out that in the liner cement mortar paving should be made waterproofing layer and layer, 01SJ914 atlas, the use of the way, it was pointed out that it should be used known as the ‘multi-purpose patent leak’ fittings. Existing drop boards are usually at 1 degree waterproofing level in toilets and below the level of live boards in living rooms.

The data is divided into: 350mm, 450mm, etc. The same level of the TTC's drop board is: 200mm, and the previous year than the drop board is 350mm, and the height of the empty is increased by 200mm-300mm by using 450mm, etc., and it is possible to bury the 200mm-300mm back less. Make up back to a small amount, to ensure the accuracy, save save labour and materials, civil construction of the comprehensive cost, plugging maintenance is convenient, bathroom does not need to suspend the ceiling, increasing the overall pure empty height, more importantly, reduce the loading load of the building. (2) Wall column, commonly known as ‘piping well’ wall piping drainage.

In the toilet cleaning appliances behind the establishment of pseudo-walls, the formation of a certain width of the configuration of the pipeline dedicated space, the drainage branch pipe does not pass through the floor and laid in the pseudo-wall, installation, and the main pipe is connected to the same floor. Wall drainage method requires sanitation and cleaning appliances to choose hanging washbasin, choose the back of the drainage type toilet. The way to achieve health, beauty, cleanliness requirements. Its shortcomings are: Cixi PE homogeneous siphon pipe fittings manufacturers of sanitary appliances to choose a smaller margin, not easy to set up floor drains, high cost, pipe repair is more difficult. GB5015-2003 specification provisions is an important issue, this wall drainage way at least does not meet the national conditions of China, and secondly, its construction investment is large, through the wall pipe of the toilet in many cases. surface water cannot be solved. There is no value in spreading