Preparation of the bottom of the electrofusion fitting pipe trench

Ningbo Heqi Pipe Co., Ltd. 2025.07.16
Ningbo Heqi Pipe Co., Ltd. Technical Information

For pressure systems for water supply, drainage or long-distance conveyance pipework, the requirements for levelling accuracy of the bottom of the pipe trough are usually not so high, provided that there are no special requirements for the design drawings. For gravity drainage systems, the gradient level must meet the specified requirements. Electrofusion fittings are supplied If the bottom of the pipe trough is fairly level and there are no very large stones in the soil, no further levelling is necessary. Of course, it is better if the bottom of the pipe trough is free of noisy stones.

However, if the bottom of the pipe trench has been disturbed or had to be disturbed during the boring process, it should be at least as dense as the landfill surrounding it. The bottom of the excavated pipe trench should be further mixed and levelled with materials such as soil and clay using small stones with sharp corners not exceeding 50mm in ordinary diameter. Wholesale Electrolytic Pipe Fittings All sizes of HDPE pipe can generally accommodate a small amount of localised unevenness in the bottom of the pipe trench, but wherever there are sharp-edged stones or hard shale in the back-buried material, this creates areas of stress concentration on the surface of the pipe, which could potentially damage the Electrolytic Pipe Parts Manufacturer.

Electrolytic pipe parts manufacturer: 1 lower baseboard: that is, the toilet floor (or local floor) under the way 2 wall columns (to the hidden disadvantages of the pipe's installation system as the main feature) way 3 layer type. (1)Lower floor:Toilet sinking drainage way refer to <Residential Toilet> 01SJ914. the specific practice is to put the toilet's structural building of the lower floor (local) 300mm as the pipe laying space.

The waterproof layer is made by sinking the building slab with the current sink, and the drainage pipe is laid along the floor slab of the lower floor in accordance with the height and slope of the design standard, and then filled with a lightweight material such as cement soya bean residue and used as a bottom liner, pointing out that a waterproof layer and layer should be made after cement mortar is paved on the liner, 01SJ914 drawing set, and in adopting this method, it is pointed out that a pipe called ‘Multi-functional Patent Leakage’ should be used. Multi-Purpose Patent Leakage" fittings should be used. Existing drop boards are usually at 1 degree waterproofing level in toilets and below the level of live boards in living rooms. Electrofusion fittings company data is divided into: 350mm, 450mm, etc., TTC of the same level of the drop plate is: 200mm, the previous year than the drop plate is 350mm, the use of 450mm, etc., so that the height of the empty is increased by 200mm-300mm, can be 200mm-300mm of the burying back to be less. Make up back to the small amount, to ensure the accuracy, save save labour and materials, civil construction of the comprehensive cost, plugging maintenance is convenient, bathroom does not need to suspend the ceiling, increasing the overall pure empty height, more importantly, to reduce the loading load of the building.